November 2024

The Weitz Company Leads with Safety Using Live Dig Radar®

Background

The Weitz Company is one of the largest Architecture/Engineering/Construction firms in the United States. Tracing its roots to a small carpentry shop founded in Fort Des Moines in 1855, Weitz has built a 170-year reputation by continuously seeking construction innovations and technologies that deliver predictable, reliable, and collaborative outcomes for clients.

Safety is not merely a policy at Weitz – it is the first principle of everything the company does. The “WeitzWay” centers on the belief that safety is a culture and a commitment, captured in their mantra: Lead with Safety. That conviction drives the team to proactively identify emerging risks and evaluate cutting-edge tools before incidents occur, not after them.

Utility strikes represent one of the most persistent and costly hazards in ground-up construction. They injure workers, delay projects, and can cost the industry an estimated $100 billion per year. Recognizing this, Weitz’s safety leadership began evaluating next-generation subsurface detection technology – and found RodRadar.

 

The challenge: When Locate Services Aren’t Enough

Standard industry practice calls for utility locates before any excavation begins. Weitz consistently follows this protocol. Yet on a student housing project at the Colorado School of Mines in Golden, CO, the team encountered a situation that underscores why locating services, despite their value, can leave dangerous gaps.

Multiple locate services had been performed on the dig area. All came back clear. But the ground, as it so often does, told a different story.

 

The Core Problem

Conventional utility locating relies on surface-level electromagnetic or ground-penetrating radar surveys conducted before the dig begins. These methods are subject to missed detections caused by imprecise records, mis-markings, interference from surrounding utilities, or simply the accumulative inaccuracy of old as-built drawings.

Once excavation starts, there is no further automated warning system in the cab. Operators proceed on trust and sometimes that trust is misplaced.

Weitz needed a solution that could function as a continuous, real-time safety net during active digging – not just a pre-dig snapshot.

 

Weitz deployed RodRadar’s LDR Excavate™, the world’s first Ground Penetrating Radar (GPR) sensor embedded directly into an excavator bucket. Unlike traditional GPR systems that require a separate operator and a pre-dig scanning pass, the LDR Excavate™ scans automatically and continuously as the bucket moves through the ground — providing real-time alerts to the operator on a tablet mounted inside the cab.

  •  

Embedded GPR sensor

built into the excavator bucket – no separate equipment, no additional operator
  •  
Real-time tablet display inside the cab showing utility position and depth alerts during active digging
  •  
Detects utilities up to ~30 inches deep per pass, scanning continuously as excavation proceeds
  •  
Works alongside and independently of pre-dig locate services, adding a critical last line of defense
  •  
Minimal training required operators master the system within a single shift.

The LDR Excavate™ seamlessly folded into Weitz’s existing excavation workflow. No production interruptions. No need for a dedicated geophysicist on-site. The system translated complex subsurface radar data into unmistakable, easy-to-act-on alerts, keeping the safety decision exactly where it belongs: with the operator in the cab.

 

Results

The value of the LDR Excavate™ was demonstrated decisively at the Colorado School of Mines site. Before digging began in one area of the project, the RodRadar bucket detected a buried utility that had not been identified by any of the multiple locate services previously performed at that exact location.

The crew halted the planned machine dig and safely hand-excavated around the utility. What could have been a damaging or dangerous – strike was prevented entirely.

1.
Zero utility strikes on the project, fulfilling Weitz’s core expectation of no utility strikes on any jobsite.
2. Critical missed utility detected that had been overlooked by multiple prior locating services at the same location.
3. Safe hand-dig executed after the alert, crew redirected without incident or schedule disruption.
4. Operator confidence increased crews reported greater assurance while digging in areas with dense subsurface infrastructure.
5. No project delays the technology integrated with daily excavation routines without impacting productivity.

 

Closing the Gap Between Locates and the Dig

Weitz’s experience at Colorado School of Mines is a textbook illustration of what RodRadar calls the “locate gap” – the window between when a locate survey is completed and when the bucket actually touches the ground. That gap is when strikes happen.

 

At this specific jobsite the RodRadar bucket identified a utility prior to starting to dig that had not been identified, despite multiple locates being performed in this location. Thanks to this innovative tool, the crew was able to safely hand dig around the utility showcasing just how exciting it is to have this technology available to help keep our jobsite teams safe and ensure we meet our expectation of no utility strikes on our projects.