Revolutionizing Excavation: Preventing Utility Strikes With Real-Time Technology

ENR Journal published a case study by Garney Construction using the Live Dig Radar solution at the Naval Support Facility Indian Head in Maryland

February 5, 2025
News

Garney Construction tested RodRadar’s Live Dig Radar (LDR) Bucket at the Naval Support Facility Indian Head in Maryland as part of a two-and-a-half-year project to install 196,000 linear feet of new waterlines. The base, vital to national defense, required careful excavation due to unexploded ordnance, archaeological sites, and restricted areas. Pilot testing of LDR began in March 2024, and by December, three crews had detected 400 utilities, with 200 found despite inaccurate or missing surface markings. Preventing damage to these utilities saved an estimated $1.55 million and 1,000 hours of downtime, helping keep the project on schedule and protecting critical operations.

The success of RodRadar’s LDR Bucket at Indian Head highlights its transformative potential for excavation safety. By providing real-time utility detection, the technology not only prevents damage and costly delays but also sets a new standard for the industry. As more contractors adopt this solution, the LDR Bucket is poised to become an essential tool in improving excavation efficiency and reducing risks on job sites nationwide.

“This is a game-changer for the industry,” says Clay Greene, department manager of construction technology at Garney. “The ability to identify utilities in real-time during excavation reduces the risk of costly utility strikes and enhances safety on the jobsite. The results from the Indian Head pilot are proof that embracing innovative tools in complex environments can deliver safer, more efficient projects.”

Moshe Dalman, CEO and co-founder of RodRadar, highlighted the impact of the LDR Bucket, stating, “Garney demonstrated that by equipping operators with the LDR tool, utility strikes—both low- and high-severity—can be significantly reduced.” By detecting utilities that traditional methods missed, Garney’s use of the LDR Bucket showcases how innovative tools can enhance project efficiency and safety. This technology aligns with Garney’s commitment to operational excellence and serves as a model for contractors looking to prevent utility strikes. The success of the LDR Bucket at Indian Head underscores its potential to revolutionize excavation safety and improve industry-wide best practices.

Read the full case study on ENR Magazine.  

Contact us

59 Derekh HaRimonim St, Rinatya 7316500, Israel
T. +972.3.641.9302 E. info@rodradar.com

Skip to content